Nana Golden Beach Tennis Club
Hersonissos_Crete
-
Date:2022
-
Status:Completed

Design Team
Charis Markodimitrakis (Lead Architect), Charoula Nikoloudi, Katerina Zouridaki
Construction Team
Nikos Gryllos (Project Manager), Dimitris Giakoumis, Pantelis Mochianakis, Christos Zaharioudakis, Eva Ntoulaki, Manos Tsikaloudakis
Collaborators
Nikos Phillipis (NG Construction)
The project concerns the design and construction of 12 new tennis courts, 3 padel courts, 2 auxiliary building for the courts, a swimming pool with a mini waterpark and the surrounding space with pathways and routes for pedestrians as well as special vehicles such as golf cars. The courts, measuring 18,5x36,5 m., are developed at several levels so they're better integrated into the natural terrain, while two of them are placed on the roof of the building.